Today the tiling underlay went down and we showcase more of the finished wall sheeting.  Getting this proper tiling sheeting down is an important part of waterproofing for any bathroom. Once the sheeting is down the next step is to apply the waterproofing, which we show in tomorrow’s Case Study post.

Ceramic Tile underlay for bathroom renovation - case study day 9-01

In these pics below we see that all the wall sheeting is up and the first coat of plaster has been applied.  The green strings on the left are to pull cabling through for the clients built-in heated towel rails:

wall sheeting for bathroom renovation - case study day 9-03   bathroom wall sheeting pic 02 - renovation case study    

In the toilet our carpenter attached special steel brackets for a wedge-shaped floating shelf that will support the small hand basin.  Sheeting has been cut neatly around the brackets which are affixed to the studwork behind.  Plumbing is ready to go:



Freedom Bathrooms are specialists in bathroom renovations brisbane southside